Group Website Text - Left Side Menu

Search for any Martin County Board of County Commissioners Projects.

District

District



Status

Location


Type

Project Type












Search Martin County Projects

Tabs

Map

List

More Info.
More Info Dixie Hwy Resurfacing (Jefferson to Indian)The work scope includes: milling and resurfacing of a 3,000’ long segment of SE Dixie Highway (CR-A1A); repair of leaking drainage piping and drainage structures, construction of 7 raised median areas in the center turn lane to provide pedestrian crossings with refuge areas; installation of two sets of flashing pedestrian warning lights, and street lighting along the corridor. Also includes replacement of two traffic signal control cabinets; replacement of traffic signal video detection cameras on one traffic signal; new signage and striping.ConstructionRoadwaysDistrict 2District 2 
More InfoAircraft Parking Apron Rehabilitation (Construction)Rehabilitate concrete apron adjacent to new Customs Facility and Airport Operations Center. Existing concrete and asphalt apron adjacent to the new Customs Facility is beyond its useful life. The proposed project will provide parking for aircraft clearing customs. The apron will be constructed of concrete due to the size of aircraft and turning movements.ConstructionAirportDistrict 2District 2 
More InfoAirport Operations Center and Airfield Electrical Vault - ConstructionConstruct new airport operations center building and Airfield Electrical Vault The current building does not meet the space requirements for the Airport staff and operations. The location occupies valuable airside property.ConstructionAirportDistrict 2District 2 
More InfoAutomatic Meter Read (AMR) Replacement3200 water meters are being replaced per year throughout the County.ConstructionUtilities, Water & SewerDistrict 1
District 2
District 3
District 4
District 5
District 1, District 2, District 3, District 4, District 5 
More InfoBlue Water Way - Septic to SewerForce main infrastructure for the septic to sewer conversion using residential grinder stations to serve 26 properties.In DesignUtilities, Water & SewerDistrict 2District 2 
More InfoCoral Gardens Neighborhood RestorationThe Infrastructure Reinvestment project includes the replacement of drainage structures, adding drainage conveyance structures, regrading of drainage swales, pavement milling, resurfacing, replacement of sidewalks, and other ancillary items within the neighborhood. This project completes the neighborhood restoration of the Coral Gardens subdivision.In DesignNeighborhood RestorationDistrict 2District 2 
More InfoDixie Hwy Resurfacing (Monterey to 5th St.)Asphalt milling and resurfacing on CR A1A (Dixie Highway) from Monterey Road to 5th Street. The project will also include the removal and replacement of failing drainage piping and new pavement markings.In DesignRoadwaysDistrict 2District 2 
More InfoGaines Avenue Water Main Assessment with Force MainProposed water main assessment to serve approximately 152 single family residential units.In DesignUtilities, Water & SewerDistrict 2District 2 
More InfoGolden Gate - Dixie Highway BeautificationFDOT will be making improvements to Dixie Highway including resurfacing, striping and medians from Jefferson Street to Indian Street, scheduled to begin construction in the spring of 2021. This project adds additional beautification through landscaping as envisioned in the Golden Gate Community Redevelopment Plan.In DesignCommunity Redevelopment Area (CRA)District 2District 2Golden Gate
More InfoGolden Gate - Pedestrian & Bike TrailsThe Golden Gate Community Redevelopment Plan calls for a system of pedestrian and bike trails. This project will provide connections to existing pathways located within the community. This multi-modal, linear park pathway will provide pedestrian and bicycle connections, increase safety, encourage walking and riding, and become a beautiful neighborhood asset. The project represents a coalition of county departments, with a variety of departments represented, CRA, Public Works, Utilities and Parks and Recreation.In DesignCommunity Redevelopment Area (CRA)District 2District 2Golden Gate
More InfoGolden Gate - Septic to Sewer ConversionConstructing sewer lines to serve 775 parcels in the Golden Gate Subdivision in order to decommission septic tanks.ConstructionUtilities, Water & SewerDistrict 2District 2Golden Gate
More InfoGolden Gate Phase II Neighborhood RestorationReplacement of drainage structures, regarding of drainage swales, pavement milling and resurfacing, and replacement of sidewalk and other ancillary items within the neighborhood.CompletedNeighborhood RestorationDistrict 2District 2 
More InfoHarbor Estates / Linden Street Neighborhood RestorationReplacement of drainage structures, regrading of drainage swales, replacement of aging utilities owned by Martin County, pavement milling & resurfacing, new sidewalk, traffic calming and other ancillary items within the neighborhood. This project completes the neighborhood restoration of Harbor Estates, Live Oak Estates, and Linden Street corridor areas.ConstructionNeighborhood RestorationDistrict 2District 2 
More InfoHydrant ReplacementReplace older and obsolete fire hydrants as needed on an annual basis.ConstructionUtilities, Water & SewerDistrict 1
District 2
District 3
District 4
District 5
District 1, District 2, District 3, District 4, District 5 
More InfoImprovements to Air Traffic Control TowerExterior building envelope repair and upgrades including: Repair leaks in exterior façade and structure; Repaint exterior façade; and replace elements in need of repair as determined during site investigations. The ATCT is more than 20 years old and due to the severe coastal climate, the building façade is in need of rehabilitation to eliminate water intrusion.In DesignAirportDistrict 2District 2 

Martin County Projects Status

Help

If you search for a project and do not receive expected results or you have questions, please submit a request for service and provide details on the project.